Material documents: reconcile report numbers, RFQ lines and item identification
Published
First establish which purchasing line and delivered material a document covers. A matching document name alone does not establish traceability.
Record and confirm by line
Put the RFQ line, full designation, dimensions, delivery identification and document number into one reconciliation record. Leave missing entries open.
If designation, condition or identification differs from the order, mark each difference and ask for an explanation. One report does not establish coverage of every size or batch. Do not invent inapplicable fields.
Request document type, coverage and acceptance requirements at quotation or order stage and obtain confirmation of what can be provided. This is a checking method, not a claim that this supplier holds a particular certificate or testing capability.
RFQ guide: https://gaozhenmetal.com/en/guides/grade-size-condition/
Enquiry: https://gaozhenmetal.com/en/contact/