DC03-C390 split deliveries: confirm document coverage by delivery
Published
Identical grade and dimensions do not establish a single material lot. Record identification, quantities and document references for each delivery, then confirm their relationship.
Separate order lines from deliveries
Keep DC03-C390, dimensions and purchasing line references intact. Add a record for each delivery without overwriting the previous one. Separate ordered quantity, current receipt and outstanding balance, with explicit units.
Establish document coverage first
Record delivery-note identification, material or package identification, document reference and open questions together. State any limited size or lot coverage explicitly. Leave missing or conflicting references unresolved; this record does not establish material properties or acceptance.
Put the required response into the RFQ
Before quotation, specify the document type, delivery identification relationship and required timing, and request a line-by-line reply. Catalogue information does not promise a particular certificate, test or traceability capability; confirm the actual material and document scope for the order.